WHAT IS THE PLAN AS MODIFIED BY THE RSC IN OCTOBER?


 

What Is The Plan As Modified by the RSC In October?

 

Based on feedback from the towns, the RSC modified the high school proposal as follows:

 
  • Keep the structurally sound part of Algonquin (3 story 1969 addition)

  • Use it as administrative space

  • Reduce overhead by leasing upper floors

  • Add a new building to the site 15,000 sq. feet smaller than previous plan by

  • Removing district offices (5,000 sq. ft.)

  • More efficient floor space using 3 story structure (10,000 sq. ft.)

  • Total size of 290,000 sq. ft.

  • Meets all state codes for reimbursement

  • Estimated construction cost reduced to $45,225,300

  • Maximum architect fee of $2,580,000

  • $45,225,300 + 2,580,000=$47,805,300 for total project[1]

  • With a 65% reimbursement,

  • Northborough would pay $18.5 million

  • Southborough would pay $11.3 million


[1] Based on state guidelines for cost per square foot.  See 60 CMR 38.00 School Construction

 